wire mesh m6 Options
Blow-out failure: failure is characterised with the lateral spalling of concrete from the proximity on the anchor's head. This kind of failure takes place for anchors (prevalently Solid-in-spot) put in in the vicinity of the edge of the concrete aspect.
Dokumentasi: Simpan catatan tentang pem